The loft conversion required the most engineering input. The access platforms incorporated new hatches opening down into the third floor below. Many of the flues in the substantial stacks had to be opened up for the installation of flue liners for the new air conditioning units. Access was also improved throughout the various loft spaces…
Read more
Creeksea Place, Essex
The Morton Partnership initially carried out a structural assessment, providing detailed advice to aid the Conservation Architect on the emergency works to stabilise the structure and help reduce the likelihood of collapse. The conservation works comprised re-roofing, structural repairs to a number of timber beams at first-floor level, and locally re-building some of the chimney…
Read more
Widbury Hill Barn, Ware
The Morton Partnership were appointed to Contract Administrate and develop the construction package for the project once planning had been obtained by Sworders. The barn’s historic features include a mix of straight, arched and ogee braces and peg jointed queen struts, which supported the purlin, which were all incorporated to be exposed within the new…
Read more
Chapel House, Earl Soham, Suffolk
We were appointed to provide full Structural Engineers services for the duration of the project to restore the fabric of the chapel. The dwelling provides living accommodation on the first floor, exposing the original scissor trusses creating a high vaulted space and incorporating a roof terrace to maximise the views. The building’s original windows were…
Read more
Ironbridge
Our works to provide engineering and technical input were on behalf of English Heritage, with the works their single largest conservation project to date. The bridge has significant historic, engineering and cultural importance with this being the first single span arch bridge formed in cast iron. Its construction marked a key point within the Industrial…
Read more
Westminster Abbey
Our work involved detailed pre contract investigations of the triforium floor structure, which sits over the aisle vaults to the main floor of the abbey. By careful assessment we were able to minimise the extent of steel work suggested previously to a minimum, thus reducing the impact on some of Wren's structure of roof trusses…
Read more
Stow Maries Aerodrome
Our works have consisted of structural reporting and appraisal of the predominately 4’’ masonry buildings with intermittent 9’’ piers, with a feature prevalent to all being embedded hoop iron reinforcement between the brick courses, to which ongoing corrosion has accelerated the need for repairs. Our works currently have included structural strengthening of the MT (Motor…
Read more
Hogarth House
The glulam frame comprises of triple and double columns with heads restrained rotationally providing moment connections and ensuring the overall stability. The concealed connections are plugged dowels with steel plates inserted into glulam members. The roof void accommodates the Cool Phase Monodraught ventilation and air conditioning units. Timber JJI joists and trapezoidal steel sheeting are…