The Morton Partnership were appointed to Contract Administrate and develop the construction package for the project once planning had been obtained by Sworders. The barn’s historic features include a mix of straight, arched and ogee braces and peg jointed queen struts, which supported the purlin, which were all incorporated to be exposed within the new…
Read more
Chapel House, Earl Soham, Suffolk
We were appointed to provide full Structural Engineers services for the duration of the project to restore the fabric of the chapel. The dwelling provides living accommodation on the first floor, exposing the original scissor trusses creating a high vaulted space and incorporating a roof terrace to maximise the views. The building’s original windows were…
Read more
Leyland SDM – Bentley House
The project comprised of the complete removal of the 1st floor plate in the existing warehouse building. The existing 1st floor was raised by approximately 1000mm, allowing the introduction of an additional floor below. Furthermore an additional storey was added on top, formed as a steel frame supported on the existing reinforced concrete structure. The…
Read more
116 High Street, Boston
The Morton Partnership initially carried out a structural assessment, providing detailed advice to aid the Conservation Architect on the emergency works to stabilise the structure and help reduce the likelihood of collapse. Following the assessment, The Morton Partnership prepared a full structural scheme to repair and extend the existing building which included extensive timber repair,…
Read more
Sheffield Cathedral
The recently completed works at Sheffield Cathedral had two main parts. Internal re-ordering, including removal of the nave and aisle 1960’s concrete floors, and installation of a new insulated slab with underfloor heating. This involved careful investigations of the existing structure to understand its construction and to allow an informed decision on the new construction.…